Sales & Support: Request A Quote
Home ProductsHome Appliance & Daily Use Moulding

Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients

Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients

    • Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients
    • Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients
    • Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients
  • Industrial Garbage Bin Mould & provides one-stop plastic solution services for clients

    Product Details:

    Place of Origin: Dongguan City China
    Brand Name: DF MOLD
    Certification: ISO9001
    Model Number: OEM

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 SET
    Price: 1000 USD
    Packaging Details: Wooden Crate For Mold
    Delivery Time: 6-10 Weeks
    Payment Terms: T/T, L/C,Western Union
    Supply Ability: 250SETS/Year
    Contact Now
    Detailed Product Description
    Product Type: Plastic Bottle Processing Type: Plastic Thermoforming Machine
    Quality-guaranteed: Japanese Standard Of QC Management & Euramerican Standards

    DF-Mold has made plenty of garbage bin mould for home application,the garbage bin mould fuction:

    Hot bushing direct cone gate industrial garbage bin mould of 60L,120L,240L,360L bucket, tank or box mould... SINO is the most profesional various big bin moulds manufacturer.

     

    1.automatically.
    2. suitable for high speed injection.
    3. long mould life.

    Details: 8613533665622

    facebook.com/jacky.qiu.737

    the following is the essential information for your reference:

     

    Bin Mould Name : 160L industrial garbage bin mould
    Bin Mould Size: 160L
    Product description: BIN material is HDPE with MFI 6
    Bin Mould cavity: 1 cavity
    Bin Mould Size: 1300x1300x2000mm
    Suitable machine: 2000T Dakumar machine
    Bin Mould material: DIN 1.2738+Copper Beryllium
    Bin Mould life: 1M
    Runner system: 1 point ANOLE hot runner direct cone gate
    Ejection system: Stripper plate
    Bin Mould running: Full automaticity
    Bin Mould features: complex mould structure.The application of Copper Beryllium leads to best cooling effect,Stroke switch controls ejection process precisely,oil and water integrator is more convenient for application and operation,Copper guide bush, abrasion resistance and prolong the mould life
    injection cycle time : 60 seconds
    Delivery time : 100 days

     

    Specification:   

    Certificates                      

    AAA grade credit enterprise, ISO9001, ISO14001, SGS

    Quality-guaranteed          

    Japanese standard of QC management &  Euramerican standards

    Service                             

    Designing the mould, CNC processing and other tooling, assemble all mould parts

    OEM & ODM service     

    Acceptable

    Design software                 

    UG, PRO-E, CAD, CAXA, etc

    Mould base Standard      

    LKM , HASCO , DME, etc

    Moulds’ steel                     

    NAK80, S136(H), 2738, 718&738 and P20 etc

    hardness of steel:              

    15--60 HRC

    cav/core material               

    2738,2343,DIN-1,S130,2344,738H,718,8407,S136,NAK80,P20 etc

    Cavity                                

    Single/multi

    Runner                              

    Hot/cold

    Mould life                          

    500,000-1,000,000 shots as you required

    Final products’ materials  

    ABS, PP, PE, POM, PA6(66)+GF, PC, PMMA HIPS, GPPS etc

    Final Products’ colors       

    Any color as your required

    Lead Time                         

    25-50 workdays based on the different products

    Relevant requirements reachable 

    ROHS, UL, or as requested

    Package                             

    Wooden case package & follow customers' requirement

     

     

    Payment term                    

    T/T, L/C at sight

    Details contact: Jacky Qiu Skype: df mold

    Manufacture STEPS:

     

    1, Quotation

    Customer provide drawings or samples, then we quote according to it.

    2, Mould deposit

    After customer accept, 50% mould charge should be paid

    3, Manufacture

    Open the mould

    4, Testing the mould

    After mould is finished, we’ll test it to make sure perfect

    5, Sample confirmation

    Send the samples to confirm

    6, Balance payment

    After samples confirmed, the balance of mould charge and  the goods should be paid

    7, Mass production

    We’ll produce the goods upon receive the payment

    8, Mass production

    We’ll produce the goods upon receive the payment

    9, Delivery

    By sea or by air as the demand fo customer

     

    Welcome customers to sample processing, custom-made map

     

    Contact Details
    Dengfeng Mold (Hongkong) Co., Limited

    Contact Person: Mr. Jacky Qiu

    Tel: 86-150-11939995

    Fax: 86-0769-85337639

    Send your inquiry directly to us (0 / 3000)