China injection plastic mould manufacturing factory,custom injection mold with clients' engineering. Quality to 0.001mm
Mould steel | SKD61,1.2344,1.2343,1.2367 etc for good mold quality, also can meet client engineering to use Pre-harden such as 718H,738 etc |
Plastic material | PET, TPR, PVC, PA, POM, ABS, PC PPR etc. |
Mould base | LKM, ML, HASCO etc. |
Hot runner system | YUDO, D-M-E etc. as client request, valve and hot tips system as engineering |
Normalize parts | HASCO, D-M-E, JIS etc.as client request, can book from china |
Software | CAD2014/ NXUG/CAE moldflow2015 |
Dimensions of the mould | Info from engineering design, max can meet 2000*2000mm |
No. of cavity | Single/Multi cavities as engineering |
Min mould life | Different steel different production,mold life 200,000 -2000000 shots |
Doff way | Auto by ejectors, Doff plates, Air valves etc |
Lead time | 2weeks-2 months |
Process | CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. |
Packing | wooden crate to pack mold well |
Plastic Mould Processing
1.Quotation |
Quotation with Customer's drawings/samples We will provide our suggestion for customers' design if changes needed ( DFM with quotation together). |
↓ | |
2.Negotiation | The price, material, payment term, ect. to checked together. |
↓ | |
3.Place an order | Customer confirm the order and send mould deposit. Project start to run. |
↓ | |
4. Mould | We provide mould design for approval before cut steel, 3D file as stp, x_t will be send ; |
↓ | |
5. T1 trial |
We send samples within the lead time also will inspect to meet engineering. Will keep improve until samples approved. |
↓ | |
6. Pre-run molding |
Customer settle mould balance after sample approved, and proceed to order products if needed to insure mold stable |
↓ | |
7. Delivery | Deliver mould or products by sea or by air per request. |
Plastic Mould Photo Show