Home > products > High Precision Injection Mould Solution > plastic injection mold parts, Thin wall precision mold making, Hot valve gate system, cycle time can meet 6 sec

plastic injection mold parts, Thin wall precision mold making, Hot valve gate system, cycle time can meet 6 sec

Category:
High Precision Injection Mould Solution
Price:
10000USD
Payment Method:
T/T, L/C,Western Union
Specifications
Mold Material:
1.2344, S136sup, NAK80,P20
Runner System:
Valve Gate, Hot Tips System
Tolerance:
Thin Wall Can Meet 0.4mm
Introduction

Deng feng mold is good at Multi-cavity moulds with automatic close up to 36 cav. 48 cav. 64cav and 72cav.

Good fill balance is very important for the cavities quality. There are eight kinds of key phenomena that contribute to mold fill balance as:

  1. Venting uniformity
  2. Uniform wall sections
  3. Uniform mold temperatures
  4. Effects of shear on melt viscosity
  5. Uniform heat profile
  6. Naturally balanced manifold design
  7. Injection profile and velocities
  8. Proper temperature

For example:

The syringe production line for medical field;

High speed cap & closure for the daily use field;

Mass production in the automotive field;

plastic injection mold parts, Thin wall precision mold making, Hot valve gate system, cycle time can meet 6 sec

Specification:   

Certificates                      

AAA grade credit enterprise, ISO9001, ISO14001, SGS

Quality-guaranteed          

Japanese standard of QC management &  Euramerican standards

Service                             

Designing the mould, CNC processing and other tooling, assemble all mould parts

OEM & ODM service     

Acceptable

Design software                 

UG, PRO-E, CAD, CAXA, etc

Mould base Standard      

LKM , HASCO , DME, etc

Moulds’ steel                     

NAK80, S136(H), 2738, 718&738 and P20 etc

hardness of steel:              

15--60 HRC

cav/core material               

2738,2343,DIN-1,S130,2344,738H,718,8407,S136,NAK80,P20 etc

Cavity                                

Single/multi

Runner                              

Hot/cold

Mould life                          

500,000-1,000,000 shots as you required

Final products’ materials  

ABS, PP, PE, POM, PA6(66)+GF, PC, PMMA HIPS, GPPS etc

Final Products’ colors       

Any color as your required

Lead Time                         

25-50 workdays based on the different products

Relevant requirements reachable 

ROHS, UL, or as requested

Package                             

Wooden case package or follow customers' requirement

Price Terms                      

FOB Shanghai Port, China

Payment term                    

T/T, L/C at sight

Send RFQ
Stock:
MOQ:
1 SET